This detail shows a brick veneer wall at slab on grade, with an 8″ CMU backup wall, continuous vapor barrier, perimeter insulation, and a concrete footing below. The section also notes anchor bolts, a treated wood shoe, gypsum board finish, flashing, staggered weeps, and the slab connection at grade.