This detail shows a brick veneer wall at slab on grade, with an 8″ CMU backup wall, continuous vapor barrier, perimeter insulation, and a concrete footing below. The section also notes anchor bolts, a treated wood shoe, gypsum board finish, flashing, staggered weeps, and the slab connection at grade.
Author: Simone Sassoli
Simone Sassoli is an Architect and Construction Project Manager specializing in high-end retail, hospitality, and office projects across the United Kingdom and Europe, with experience delivering complex spaces for luxury brands and international clients.



















